top of page
KE Elektronik Website Kundenreferenz (1).jpeg

chargeCLUSTER

The pre-configured sub-distribution including load management.

Up to 22 kW charging power per charging point

Pre-configured sub-distribution including load management

Flexibly expandable

Easy installation

The centralized approach

No hidden costs

With conventional wallboxes, the unexpected costs usually arise after the initial quote, once the wallboxes have already been ordered. This is because, if all of them are to be put into operation simultaneously, a sub-distribution board and the associated load management system, necessary to prevent voltage spikes, are typically lacking.

At chargeBIG, the sub-distribution is an integral part of the charging solution.

Quick installation

The chargeCLUSTER sub-distribution board is delivered pre-wired; all that is required is to lay the cables to the charging points and connect the power supply.

Easy maintenance

Thanks to the centralized approach, all power electronics are integrated into a single system and have a modular design. This makes maintenance and repairs shorter and more cost-effective than with conventional charging solutions.

In the supply room

chargeCLUSTER

Pre-configured sub-distribution

chargeCLUSTER Portfolio

In accordance with calibration law
(Recalibration in the field possible)

Dynamic or static load management

Interfaces:

Modbus TCP, OCPP 1.6J

Communication via LTE & LAN

Integration into the building management system

Integration into fire alarm system

Integrated RCD & DC fault current sensor

chargeCLUSTER

Schematic diagram for six charging points

chargeCLUSTER Portfolio
Fotolia_113894962_WEB.jpg

Smart electrification in practice

chargeCLUSTER in practice for 100 charging points

Intelligent charging infrastructure thanks to a centralized approach

bottom of page